AVC Engineering · Project showcases
Engineering expertise. Applied.
From group-wide HSE governance to plant integrity and maintenance strategy. Explore the challenges AVC has addressed, the work delivered and the decisions it supports.
The work behind the value.
10 showcases · 6 countriesDelivered engagements and ongoing programmes across energy and industrial assets. Open a project to explore the challenge, AVC’s role and the value delivered.
Figures describe study findings, modelled scenarios, programme scope or accepted deliverables, as labelled. They are not presented as measured post-project savings.
10 projects
ADNOC GroupDelivered
One HSE framework across ADNOC Group
Rationalising HSE standards and supporting a consistent approach to assurance across 32 group companies.
Framework output40%Fewer redundant or obsolete HSE requirements
View project detailsClose project details
Fewer redundant or obsolete HSE requirements
The challenge
HSE requirements had accumulated across a group of subsidiaries and joint ventures spanning upstream, downstream, marine and logistics. Standards overlapped, contradicted each other, and were interpreted differently from one company to the next.
What AVC did
- Reviewed 160+ existing HSE standards, guidelines and corporate practices against UAE law and international frameworks, including IOGP.
- Built one framework of 8 risk domains and 80+ Corporate Practices, each paired with an audit-ready assurance checklist.
- Rolled it out through 9 computer-based training modules and 11 train-the-trainer sessions on SAP Learning, working with 120+ ADNOC subject matter experts.
Value delivered
- 40%fewer redundant or obsolete HSE requirements after rationalisation
- 15,000+personnel trained on the new framework
- 1HSE framework across 32 group companies and five business lines.
ORYX GTLDelivered
A plant integrity and life-extension plan for ORYX GTL
Connecting failure analysis, reliability modelling and remaining-life assessment to turnaround and investment decisions.
Modelled improvement+1.7 ptsProduction-efficiency improvement in a turnaround scenario
View project detailsClose project details
Production-efficiency improvement in a turnaround scenario
The challenge
Fischer-Tropsch reactor coils were thinning and primary filters were repeatedly blocking. At the same time, ORYX GTL had to choose a turnaround strategy and test whether the plant could run beyond its 2032 design life to 2039.
What AVC did
- Root cause analyses of the FT reactor coil thinning and LTFT primary filter blocking.
- A RAM model of 1,600 equipment items, simulated over 24 years, testing 10 turnaround and failure scenarios.
- Bad-actor and black-swan analysis (2006–2021), a review of maintenance strategies across 30,000+ SAP equipment items, an organisational assessment and a remaining-life assessment to 2039.
Value delivered
- +1.7 ptsModelled production-efficiency improvement for three-yearly rather than two-yearly turnarounds: 83.5% to 85.2%. This is a study scenario.
- 2Coil damage mechanisms identified: internal flow-accelerated corrosion and external catalyst erosion. Filter failures were traced to manufacturing quality assurance.
- 2039Life-extension case assessed to 2039, supported by capital and operating expenditure forecasts across equipment disciplines.
S-Chem (Chevron Phillips JVs)Delivered · repeat client
Targeting inspection where damage occurs at S-Chem
Damage mechanism reviews and risk-based inspection across three Jubail petrochemical plants.
Study finding~50%Historical JCP inspection locations outside damage-susceptible zones
View project detailsClose project details
Historical JCP inspection locations outside damage-susceptible zones
The challenge
Inspection programmes had grown out of historical practice rather than damage mechanisms. Inspection effort was not reliably landing where corrosion actually occurs.
What AVC did
- Damage mechanism reviews, piping circuitisation and API 581 RBI in Meridium across SCP and JCP, including 17 JCP units approved in three batches.
- Registers covering 21,739 tagged items, 3,000+ piping circuits and 1,617 corrosive deadlegs marked up on 745 P&IDs.
- RBI evergreening of about 900 equipment items after turnaround, plus inspection isometrics and a workbook for each circuit.
Value delivered
- ~50%Of historical JCP inspection locations were found outside damage-susceptible zones: 2,860 of 5,777. A finding used to re-target inspection effort.
- 1 in 3JCP inspection locations used a technique unsuited to the damage mechanism. The study identified opportunities for more targeted inspection.
- 3 plantsRepeat awards across SCP, JCP and SPCo, extending from RBI into integrity and inspection management.
Q-Chem · RLOC · RLPPDelivered + ongoing
Risk-based inspection programmes for Ras Laffan operators
Delivered corrosion and RBI studies for Q-Chem and RLOC, with fixed-equipment monitoring work continuing at RLPP.
Delivered scope23 unitsQ-Chem I, Q-Chem II and RLOC covered by delivered RBI studies
View project detailsClose project details
Q-Chem I, Q-Chem II and RLOC covered by delivered RBI studies
The challenge
Three Ras Laffan operators needed inspection programmes based on damage mechanisms, with complete piping-circuit and deadleg coverage, to support risk-based inspection.
What AVC did
- Damage mechanism review, piping circuitisation and Meridium API 581 RBI across 23 units at Q-Chem I, Q-Chem II and RLOC, with corrosive deadleg registers to API 570/574.
- DMR, corrosion loops and RBI for RLOC's NZLD project and the Furnace-6 project, certified by the client as completed to a satisfactory level.
- Now delivering RLPP's Fixed Equipment Monitoring Program: 1,359 P&IDs, 33,125 piping lines and 1,276 fixed equipment items.
Value delivered
- 23process units across Q-Chem I, Q-Chem II and RLOC moved onto a risk-based inspection basis
- 33,125Piping lines in the scope of RLPP’s ongoing risk-based fixed-equipment monitoring programme.
- 3Ras Laffan operators served through successive awards.
ADNOC DrillingDelivered
HSE studies across ADNOC Drilling’s rig fleet
Rig-by-rig safety cases, hazard studies and surveys, supported by a register of client-accepted deliverables.
Accepted deliverables73Dropped-object surveys accepted by the client
View project detailsClose project details
Dropped-object surveys accepted by the client
The challenge
A growing rig fleet needed current safety cases and hazard surveys, delivered rig by rig, to keep operations compliant and accepted.
What AVC did
- Rig safety cases, HAZOP and HAZID studies.
- Dropped-object (DROPS) surveys across the fleet, including a rig in Singapore.
- Noise surveys, each delivered against a tracked register with client acceptance letters.
Value delivered
- 18rig safety cases accepted by the client
- 73Dropped-object surveys accepted by the client, providing a documented basis for managing dropped-object hazards.
- 9Noise surveys accepted by the client.
ADNOC OffshoreDelivered
An integrity organisation ready for a growing workload
An organisational health check for ADNOC Offshore’s Asset Integrity Division, informing staffing and accountabilities.
Study finding2.4×Pipeline inspection workload quantified for resourcing decisions
View project detailsClose project details
Pipeline inspection workload quantified for resourcing decisions
The challenge
After the merger, the Asset Integrity Division's structure, staffing and competencies had to keep pace with a sharply rising integrity workload.
What AVC did
- Reviewed 220+ evidence items and interviewed 35 people, about 20% of the division.
- Benchmarked the organisation against global and regional practice.
- Delivered a manpower model, RACI, improvement roadmap and Management of Change pack.
Value delivered
- 2.4×Pipeline inspection workload quantified for 2024–2027: approximately 77 inspections a year compared with a historical 32.
- 4 → 32Growth in the division’s project portfolio made visible to support resourcing decisions.
- ExcellentClient feedback rating for the engagement.
Harbour EnergyDelivered
A clearer maintenance strategy for Harbour Energy’s Solan field
Reviewing maintenance data, safety-critical flagging and assurance routines against the platform’s performance standards.
Review finding232Duplicate maintenance routines identified for removal
View project detailsClose project details
Duplicate maintenance routines identified for removal
The challenge
Solan's Maximo maintenance build had become inconsistent. Routines were duplicated, safety-critical flagging was uncertain, and there were gaps against the platform's performance standards.
What AVC did
- A maintenance and reliability strategy and roadmap covering 25 systems, with 1,615 instrument tags mapped.
- A line-of-sight review across 16,096 Maximo locations: from performance standards, through safety-critical flagging, to assurance routines.
- 153 actions on the performance standards and in Maximo, including 36 new assurance routines.
Value delivered
- 22% → 13%Review recommendation to revise safety-critical flagging from 2,955 to 1,806 tags, providing a clearer basis for assurance priorities.
- 232Duplicate maintenance routines identified for removal. This is a review finding.
- 6Assurance gaps identified across flame arrestors, pressure safety valves, Rig-Saver valves, ignition control, fire and gas, and cause-and-effect systems.
Fauji Fertilizer Company (FFC)Delivered
An asset performance improvement roadmap for FFC
A maturity baseline and prioritised roadmap for ageing ammonia and urea plants at Mirpur Mathelo and Goth Machhi.
Assessment output128Prioritised recommendations in the improvement roadmap
View project detailsClose project details
Prioritised recommendations in the improvement roadmap
The challenge
FFC needed a clear assessment of asset integrity, maintenance and reliability to support a service-factor target above 97% at ageing ammonia and urea plants.
What AVC did
- An ISO 55001-aligned gap and maturity assessment across 13 departments.
- A review of the asset hierarchy against ISO 14224.
- A prioritised improvement roadmap and a three-day training programme.
Value delivered
- 128prioritised recommendations forming the improvement roadmap
- 13Departments covered by the ISO 55001-aligned gap and maturity assessment.
- 3 daysTraining delivered alongside the assessment and improvement roadmap.
Ma'adenDelivered
A common basis for asset priorities at Ma’aden
Rebuilding the Ammonia 2 asset hierarchy and aligning equipment criticality with a controlled company procedure.
Delivered frameworkISO 14224Aligned hierarchy with criticality re-mapped for Ammonia 2
View project detailsClose project details
Aligned hierarchy with criticality re-mapped for Ammonia 2
The challenge
The ammonia plant had no consistent asset hierarchy or criticality method, so maintenance priorities could not be set on a common basis.
What AVC did
- A criticality assignment procedure and template, issued as a Ma'aden controlled document.
- An ISO 14224-aligned rebuild of the Ammonia 2 asset hierarchy.
- Criticality re-mapped to the new hierarchy, with a pilot of main-function assessment.
Value delivered
- 1company criticality procedure, giving one basis for setting maintenance priorities
- ISO 14224aligned asset hierarchy for Ammonia 2, with every asset's criticality re-mapped to it
PETRONAS Carigali TurkmenistanIn progress
Process safety studies for PETRONAS in Turkmenistan
Revalidating HSE cases and process safety information for onshore gas facilities and offshore hubs under an ongoing service agreement.
In progress4 yearsService agreement for ongoing process safety studies
View project detailsClose project details
Service agreement for ongoing process safety studies
The challenge
PC(T)SB needs its operations HSE cases and process safety information revalidated to current methods and data, across onshore gas processing and offshore hubs.
What AVC is delivering
- An operations HSE case revalidation for the gas treatment plant and onshore gas terminal, including expansion.
- A new QRA in PHAST/SAFETI 9.3 using OGP 2019 leak data, plus building risk assessment, fire and explosion risk assessment, hazardous area classification, bow-ties, ALARP and safety-critical elements.
- A second call-off for the MCR-A hub HSE case.
Ongoing scope and progress
- 4 yrsService agreement running from 2026 to 2030. Study delivery is in progress.
- 2Call-offs issued for onshore facilities and the MCR-A offshore hub.